  HPIM1114_JPG.jpg - The Army Corps required that the pipe not be porous and that the joints not leak.  In order to ensure this we had to vacuum test each section of pipe.  
Picture10_jpg
Picture11_jpg
Picture9_jpg
Picture8_jpg
HPIM1182

 The Army Corps required that the pipe not be porous and that the joints not leak. In order to ensure this we had to vacuum test each section of pipe. Download