  HPIM1183.JPG - Two of the bid items on the contract required the installation of Reinforced Concrete Pipe (RCP) at two different locations.  One site used 36" diameter RCP and the other site used 48" RCP.  
HPIM1181
HPIM1114_JPG
Picture10_jpg
Picture11_jpg
Picture9_jpg

 Two of the bid items on the contract required the installation of Reinforced Concrete Pipe (RCP) at two different locations. One site used 36" diameter RCP and the other site used 48" RCP. Download